Construction time: 2007~2008
Location: Dist. Cuttack, Orissa State (KCW), RGP, INDIA
Client: OCL India Ltd.
End User: Kapilas Cement Manufacturing Works, OCL-RGP
Consultant: Holtec Consulting Private Limited
Equipment:
D778~D785, DB1200,1200,1200,1200, 750 /17.6, QGC500, 250, 500,500 /27.4
Stacking capacity: 1200tph, 750tph, Reclaiming capacity 500tph, 250tph
D768, YG750/90
Stacking and Reclaiming capacity: 750tph
Material: Coal, Additive, Corrective, Limestone