Construction time: 2007~2009
Location: Sanghipuram, Abdasa Taluka, Kutch District, Gujarat, India
Client: Sanghi Industries Limited (SIL)
End User: Sanghi Industries Limited (SIL)
Consultant: Holtec Consulting Private Limited
Equipment:
HDB215/22.7 Stacker (D893) ,
QGC215/24.4 Side scraper Reclaimer (D894)
Material: Lignite
Capacity: Stacking: 215tph, Reclaiming: 215tph